A hybrid flow shop model for an ice cream production scheduling problem

Imma Ribas Vila, Ramon Companys Pascual

Abstract


In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the real constraints and the criteria used by planners. The problem considered has been formulated as a mixed integer programming. Further, two competitive heuristic procedures have been developed and one of them will be proposed to schedule in the ice cream factory.


Keywords


scheduling; hybrid flow shop; mathematical programming; heuristics

Full Text:

PDF


DOI: https://doi.org/10.3926/jiem..v2n1.p60-89


Licencia de Creative Commons 

This work is licensed under a Creative Commons Attribution 4.0 International License

Journal of Industrial Engineering and Management, 2008-2024

Online ISSN: 2013-0953; Print ISSN: 2013-8423; Online DL: B-28744-2008

Publisher: OmniaScience